Tore out the workbench and moved the cabinets from the east wall to the south.


Dropped some sheet rock and used a chain hoist to lift the furnace up on the ledge.

Slid the freshly repainted oil tank into the SE corner and plumbed in the pump. I got really lucky and was able to reuse all of the pipe that came with it and only had to cut and rethread one piece.

At this point, all the wiring and oil supply plumbing is done. Since the fireplace shop quoted me over $100/ft for chimney pipe, I'll be watching CL for more reasonably priced options. I've also been collecting fuel for it. Next winter should be pretty comfy.